Construction Polyurethane Raw Materials Formulated Blend Polyether Polyol PU Sealant
|
Still deciding? Get samples of $ !
Order Sample
|
Product Details
| Customization: | Available |
|---|---|
| Molecular Principal Chain: | Naphthenic Polymer |
| Color: | Brown |
Shipping
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
Payment Guarantee
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Secured Trading Service
Diamond Member Since 2020
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Year of Establishment
2018-03-16
Address
No. 189 West Xincun Rd, Zhangdian District, Zibo, Shandong, China
Registered Capital
1,000,000 RMB
Find Similar Products
Basic Info.
- Model NO.
- LY-4203W
- Appearance
- Light Yellow Transparent Viscous Liquid
- Hydroxyl Value Mgkoh/G
- 350±50
- Dynamic Viscosity (25℃) MPa.S
- Light Yellow Transparent Liquid 400±50
- Density (20℃) G/Ml
- 1.1±0.02
- Storage Temperature ℃
- 10-25
- Transport Package
- Steel Drum/IBC Drum/Tank
- Specification
- pure
- Trademark
- G-TECH@
- Origin
- China
- Production Capacity
- 50000mt/Year
Packaging & Delivery
- Package Size
- 60.00cm * 60.00cm * 102.00cm
- Package Gross Weight
- 218.000kg
Product Description
Description
LY-4203W is a formulated polyol of polyols,surfactants,catalysts and other additives, which is used preferable for insulation and installation, such as bonding, soundand heat insulation, sealing, filling up crack and gap in reaction with MDI.
Physical and Chemical Property
Characteristic & Usage
Then production is best when processing under temperature -10ºC~+15ºC(winter time).It is good performance on close cell,strong adhesion,more foam expansion times,fine elasticity and dimensional stability.
Package & Storage
Package:200kg/drum
Storage:Avoid direct sun, Stored in a cool, ventilated, dry place, temperature is below +20°C.Shelf life 12months.
Operation Suggestion
Because there is reaction process during filling can,in order to ensure recation activity and fresh,it is suggested to adjust the materials temperature to standard 20ºC before filling can,and keep the reday-made product for 24hours under 20ºC before using.
In the process of filling,the process order is recommended as below:formulated polyol→MDI→SEALING→dimethyl ether→shaking rapidly→LPG→shaking.When adding into polyol and MDI,should seal the cap and fill dimethyl ether at once.And shake well.Then fill the LPG and shake well.When filling each component,the interval time should be as shorter as much,especially under the high temperature and humidity condition.
In order to ensure quality,you'd better do trial test firstly.When trial test ok,begin bulk production.
Under other non-standard temperature condition and technical condition,the product quality will be varied.Please consult us.
LY-4203W is a formulated polyol of polyols,surfactants,catalysts and other additives, which is used preferable for insulation and installation, such as bonding, soundand heat insulation, sealing, filling up crack and gap in reaction with MDI.
Physical and Chemical Property
| Item | Index |
| Apperacne | Light yellow transparent liquid |
| Viscosity@25ºC | 400±50 |
| Specific gravity@25ºC | 1.1±0.01 |
Characteristic & Usage
Then production is best when processing under temperature -10ºC~+15ºC(winter time).It is good performance on close cell,strong adhesion,more foam expansion times,fine elasticity and dimensional stability.
Package & Storage
Package:200kg/drum
Storage:Avoid direct sun, Stored in a cool, ventilated, dry place, temperature is below +20°C.Shelf life 12months.
Operation Suggestion
Because there is reaction process during filling can,in order to ensure recation activity and fresh,it is suggested to adjust the materials temperature to standard 20ºC before filling can,and keep the reday-made product for 24hours under 20ºC before using.
In the process of filling,the process order is recommended as below:formulated polyol→MDI→SEALING→dimethyl ether→shaking rapidly→LPG→shaking.When adding into polyol and MDI,should seal the cap and fill dimethyl ether at once.And shake well.Then fill the LPG and shake well.When filling each component,the interval time should be as shorter as much,especially under the high temperature and humidity condition.
In order to ensure quality,you'd better do trial test firstly.When trial test ok,begin bulk production.
Under other non-standard temperature condition and technical condition,the product quality will be varied.Please consult us.
Send your message to this supplier
People who viewed this also viewed
Find Similar Products By Category
- Supplier Homepage
- Products
- HOT SALE
- POLYETHER POLYOL
- Construction Polyurethane Raw Materials Formulated Blend Polyether Polyol PU Sealant
Related Categories
Hot Searches
More